Floors, Wall, Ceiling
1) Provide adequate hot water for all fixtures in the establishment. Multiple point of use water heaters are insufficient for the fixtures each serves. Recommend installing a minimum 75 gallon water heater to serve 3-compartment sink, dish machine, hand sink, and prep sink (HS and prep sink located in ice machine area). The Rheem RETEX-18 serving the mop and 2 hand sinks is sufficient for those fixtures only; the Rheem RETEX-13 is sufficient for the 2 hand sinks at the far side of kitchen and walk-up beverage area; the Rheem RETEX-13 is sufficient for the hand sink in the outdoor bar area. Do not add additional fixtures to the Rheem units listed above. If additional Rheem units are installed, use only the RETEX-18 model, and consult with inspector on how many to use. A dish machine cannot be installed on these type of small point of use water heaters.
2) Provide adequate cooking capacity inside kitchen area; per PR supervisor, provide a minimum 2 alto-shaams for smoking, that do not require being placed under a hood.
3) Provide true air gaps to all drain lines throughout establishment (all drain lines must be a minimum of 1” above all floor sinks or hub drains).
4) Remove single compartment prep sink – relocate 2 compartment prep sink in its place. If you choose to keep both, hot water requirements must be met.
5) Install a sneeze guard in deli area, both at counter and prep cooler.
6) Remove soda tower from walk-up beverage area; a jockey box with integral cold plate and sliding lid may be used in conjunction with a soda gun.
7) For jockey box above, it must drain indirectly to the sewer; provide a hub drain with a minimum 1” air gap.
8) Install fly fan at window to kitchen. Ensure fan turns on via a micro switch as soon as window opens, and stays on.
9) Provide weather stripping/door sweeps on all doors to exterior of main building, where any sunlight is visible around door.
10) Flash hood to ceiling and wall.
11) Repair hole in ceiling at hood.
Floors, Wall, Ceiling
1) Provide adequate hot water for all fixtures in the establishment. Multiple point of use water heaters are insufficient for the fixtures each serves. Recommend installing a minimum 75 gallon water heater to serve 3-compartment sink, dish machine, hand sink, and prep sink (HS and prep sink located in ice machine area). The Rheem RETEX-18 serving the mop and 2 hand sinks is sufficient for those fixtures only; the Rheem RETEX-13 is sufficient for the 2 hand sinks at the far side of kitchen and walk-up beverage area; the Rheem RETEX-13 is sufficient for the hand sink in the outdoor bar area. Do not add additional fixtures to the Rheem units listed above. If additional Rheem units are installed, use only the RETEX-18 model, and consult with inspector on how many to use. A dish machine cannot be installed on these type of small point of use water heaters.
2) Provide adequate cooking capacity inside kitchen area; per PR supervisor, provide a minimum 2 alto-shaams for smoking, that do not require being placed under a hood.
3) Provide true air gaps to all drain lines throughout establishment (all drain lines must be a minimum of 1” above all floor sinks or hub drains).
4) Remove single compartment prep sink – relocate 2 compartment prep sink in its place. If you choose to keep both, hot water requirements must be met.
5) Install a sneeze guard in deli area, both at counter and prep cooler.
6) Remove soda tower from walk-up beverage area; a jockey box with integral cold plate and sliding lid may be used in conjunction with a soda gun.
7) For jockey box above, it must drain indirectly to the sewer; provide a hub drain with a minimum 1” air gap.
8) Install fly fan at window to kitchen. Ensure fan turns on via a micro switch as soon as window opens, and stays on.
9) Provide weather stripping/door sweeps on all doors to exterior of main building, where any sunlight is visible around door.
10) Flash hood to ceiling and wall.
11) Repair hole in ceiling at hood.