NA means not available. See detailed inspection reports for additional information.
OC inspection for a Class 3 10+ E&D permit was conducted with owner Tristan W. by appointment. The establishment was closed and not operating at time of inspection. This establishment/operation has demonstrated sufficient compliance to proceed with the issuance of the permit. To complete the permitting process, issuance of this permit, and begin operation, the applicant must first submit payment of the annual operating permit fee to the Department’s Administrative Services. Fees paid up to this inspection approval do not include the annual operating permit fee. PAYMENT with a credit/debit card can be made via phone at 602-506-6824, Option 2. Per MCEHC Chapter I, Regs 4 & 5, no person shall conduct an operation or operate an establishment for which a permit is required without holding the necessary and valid permit to do so. Payment with a credit/debit card can be made on-line via select “Pay a Fee” at esd.maricopa.gov. Please note that if you select payment via online, the annual operating permit fee invoice may take up to 7 business days to post online. Also, checks and money orders are accepted via US Mail. If you select payment via US Mail, for further instructions please refer to the printed invoice. No operating permit is valid, until the permit fee is received by the Department. It is the responsibility of the permit holder/owner to notify MCESD if there are contact/ billing address changes. Please address the following items prior to the OC re-inspection within 30 days: 1) Provide a dedicated single compartment prep sink, as discussed. 2) Repair the hot water handle for the three compartment sink so that the water fully shuts off. 3) Transition the flex drains for the soda fountain area and beer tap to rigid PVC or ABS and provide 1" minimum air gaps above the floor sinks. 4) Provide the vent drain cup for the Watts 009 backflow preventer upstream of the soda fountain. Indirectly plumb the backflow to the floor sink with a 1" minimum air gap. 5) Regrout the flooring area around the warewash areas to provide a smooth and flush finish. 6) Clean the ventilation fans in the restrooms. 7) Provide u-shaped toilet seats in the restrooms. 8) Caulk escutcheon plates and plumbing penetrations throughout the facility with silicone. 9) Provide the missing clean out covers, as needed. 10) The perforated acoustical ceiling tiles above the soda fountain are not approved. Provide a smooth and washable ceiling tile material. Please be advised that the New Business Permit Application fee includes one initial inspection and one follow-up inspection. Additional fees will be assessed for any additional follow-up plan review inspections. MCESD inspection report was delivered via email. No County legal action will result from this inspection.