Inspection Report
Business Name
American Leadership Academy
American Leadership Academy
Business Address
17600 W Olive Ave Waddell AZ 85355
17600 W Olive Ave Waddell AZ 85355
Permit Number
FD-82495
FD-82495
Permit Type
Food Establishment - Eating & Drinking
Food Establishment - Eating & Drinking
Inspection Purpose
Food Review Inspection
Food Review Inspection
Inspection Date
3/14/2022
3/14/2022
Grade
Priority Violation
0
0
Inspection Status
Completed
Completed
Comments/Details
Pre-final walk through with the superintendent for the kitchen. The following items were discussed:
1). All penetrations through the wall and ceiling in the walk-in units will be filled and finished out smooth.
2). Side room ceiling will be scrim wrapped.
3). Walk-in units will be flashed to the ceiling.
4). Hood will be caulked to the back wall.
5). All escutcheons and clean out covers will be installed. Also for AC condensate drains.
6). Side rooms will be painted with washable paint, laundry room will receive coved base.
7). Water heater drains will be led to the mop sink, see if you can bring all the drains to the wall and then over, follow gravity flow, brace and provide air gap.
8). Mop sink will have FRP In the splash zone.
9). Provide a faucet or angle stop for the additional water line at the mop sink.
10). Label ice machine in laundry room with sign, not for human consumption.
11). All sinks will be caulked to the wall at the top wall juncture. Keep caulk joint flush or beveled away from the wall if wide.
12). Walk-in floors will be water sealed.
13). Dry storage may have acoustic ceiling tile.
At final all equipment needs to be in and on and holding at proper temperatures. Provide hot and cold water at all sinks.
No County legal action will result from this inspection.
E-mailed to superintendent.
Inspection rights included.
1). All penetrations through the wall and ceiling in the walk-in units will be filled and finished out smooth.
2). Side room ceiling will be scrim wrapped.
3). Walk-in units will be flashed to the ceiling.
4). Hood will be caulked to the back wall.
5). All escutcheons and clean out covers will be installed. Also for AC condensate drains.
6). Side rooms will be painted with washable paint, laundry room will receive coved base.
7). Water heater drains will be led to the mop sink, see if you can bring all the drains to the wall and then over, follow gravity flow, brace and provide air gap.
8). Mop sink will have FRP In the splash zone.
9). Provide a faucet or angle stop for the additional water line at the mop sink.
10). Label ice machine in laundry room with sign, not for human consumption.
11). All sinks will be caulked to the wall at the top wall juncture. Keep caulk joint flush or beveled away from the wall if wide.
12). Walk-in floors will be water sealed.
13). Dry storage may have acoustic ceiling tile.
At final all equipment needs to be in and on and holding at proper temperatures. Provide hot and cold water at all sinks.
No County legal action will result from this inspection.
E-mailed to superintendent.
Inspection rights included.
Definitions
- Priority Violation
- Major violation that directly contributes to increasing the risk of foodborne illness or injury (e.g. Food employees do not properly wash hands when required).
- Priority Foundation Violation
- Minor violation that does not directly contribute to an increased risk of foodborne illness but failure to correct this violation may lead to the occurrence of a priority violation. For example, hand washing soap and paper towels not available at hand wash sink (may lead directly to food employees not properly washing hands when required).
- Core Violation
- Minor violation that relates to general maintenance and sanitation (e.g. No sign reminding employees to wash hands).
- Cutting Edge Program
- All county food-related establishments can partner with Maricopa County to implement a proactive approach to reducing foodborne illness risk factors by implementing food safety systems that include policies, training, and verification processes.
Priority Foundation Violations | ||||||
Number of Violation(s) |
0 | 1 | 2 | 3 | 4+ | |
---|---|---|---|---|---|---|
Priority Violations |
0 | A | B | B | C | D |
1 | B | B | B | C | D | |
2 | C | C | C | C | D | |
3 | D | D | D | D | D | |
Any legal action for a pattern of non-compliance or permit suspension results in a D |